Project summary

 Name : EDAR Sinova Soria

 Country : Spain

 City : Soria

 Year : 2022 - 2024

 Diameter : 5,00m

 Contractor Company : OHLA

Sinova wastewater treatment plant (EDAR Soria).

The tunnel construction will ensure adequate treatment of wastewater from the urban centres of Soria and Los Rábanos, thus avoiding environmental damage to the receiving environment.

 

The HK tunnel boring machine drilled the 5-kilometre-long emissary tunnel with very different types of soil, from sand with a lot of water to clay, passing through different areas of very difficult faults and which needed very special treatment to be able to advance properly.

 

The technical service and assistance of TNL18 has been essential for the correct progress of the TBM.

For soil treatment, using the foaming agents ACTISOYL 100, ACTISOYL CC and the polymers ACTI+ WW and ACTI+ ABS.

For tail sealing, ACTISEAL PS1, ACTISEAL FF and ACTISEAL 18 mastics were used.

For main bearing protection, ACTISEAL MB mastic and GR4520 Ep2 grease were used.

 

Product used
Soil conditioning:
ACTISOYL 100, ACTISOYL CC ACTI+ WW. ACTI+ ABS
Tail seal grease
ACTISEAL PS1 ACTISEAL FF. ACTISEAL 18
Main bearing sealing
ACTISEAL MB GR4520 Ep2