Thames Tideway Central

The Thames Tideway Central Tunnel is the longer part of the Thames Tideway Tunnel Project that consist of the sewage water collection of London from Acton to Abbey Mills pumping Station.

PROJECT SUMMARY

 Name : THAMES TIDEWAY CENTRAL

 Country : United Kingdom

 City : London

 Year of completion : 2019

 Diameter : 2x ɸ8,80m

 Consutruction company : Ferrovial, Laing O'Rourke

Reconnecting London with the river thames

The Thames Tideway Central Tunnel is the longer part of the Thames Tideway Tunnel Project that consist of the sewage water collection of London from Acton to Abbey Mills pumping Station.

 

The aim of this project is to alleviate flooding and tackle the tens of millions of tons of raw sewage which discharge into the River Thames every year.

 

The TTT Central will be bored with two EPB NFM machines of 8,84m diameter each one, from Kirtling Street Shaft to Chambers Wharf for the first machine and to Carnwarth Road Riverside for the second machine.

 

1st tunnel length is 5 km and 2nd tunnel length are 7,5 km.
During the excavation of both tunnels, we faced all different ground typologies in London like London clay, Lambeth, Harwich formation and Chalk.

 

TNL18 was in the Project leading the soil conditioning with 3 foaming agents like ACTISOYL 100, ACTISOYL 20W and ACTISOYL CC. It was necessary to use the pure polymer ACTI+ WW in some special areas where water ingress was high.
As well, TNL18 supplied tail seal grease ACTISEAL PS1 and hyperbaric additive ACTIEDGE.

Product used
Soil conditionning
ACTISOYL 100 ACTI+CC ACTIROCK 10W
Tail Seal Grease
ACTISEAL PS2 ACTISEAL 18
Additives and Polymers
Lorem ipsum dolor sit amet, consec tetur adipiscing elit.
Project’ pictures

Photo & vidéos reports

other projects

Your may also be interested in

Here you can check another important Projects
Spain
Metro Barcelona L9

Metro Barcelona L9