 Name : Metro Barcelona L9

 Country : Spain

 City : Barcelona

 Year : 2022

 Diameter : ɸ12,00m

 Construction Company : Dragados, Acciona, Comsa, Acsa

The 12m EPB tunnel

The 12m EPB tunnel boring machine for the central section of metro line 9 in Barcelona was stopped for 11 years, but since last June 2022, it has been advancing to finish the tunnel of the central section of this infrastructure that will cross the upper part of Barcelona.

When TBM stopped more than a decade ago, 4.3 kilometers remained to be drilled between Zona Universitaria and Lesseps.

The terrain to be excavated is divided into granite and slate, both of which are very difficult and which require very special treatment in order to progress properly.

The technical service of TNL18 has been essential for the correct progress of the TBM.

For soil treatment, using foaming agents ACTISOYL 20W, ACTISOYL CC and ACTI+ WW polymer.

For tail sealing, ACTISEAL PS1 tail seal grease was used.

ACTISEAL MB mastic and GR4520 Ep2 grease have been used to protect the main bearing.

Product used
Soil conditionning
ACTISOYL 20W ACTISOYL CC ACTI+ WW polymer
Tail Sealing
ACTISEAL PS1
Bearing
ACTISEAL MB GR4520 Ep2
Project’ pictures

Photo & vidéos reports

other projects

Your may also be interested in

Here you can check another important Projects
UK
High Speed 2

Skanska Costain Strabag joint venture, is delivering full detailed design and construction of Phase One of the UK’s new high-speed railway in the southern section of the overall High Speed Two (HS2) project.

Spain
Metro Barcelona L9

Metro Barcelona L9

Denmark
Metro Copenhagen