PROJECT SUMMARY

 Name : Metro Catania

 Country : Italy

 City : Catania

 Year : 2017

 Diameter : ɸ11,00m

 Construction Company : CMC

Metro Catania

Catania metropolitan line is currently characterised by a total length of 8.8km, from Nesima to Stesicoro. 

The EPB TBM of 10,5m of diameter was working in different geologies like sands, gravels, etc…

 

The geotechnical and structural analysis of these civil works were complicated by the presence of a really challenging geological formation, characterised by the interaction between the shallow lava stone layer and the underlying sedimentary clay bed.

 

In this exciting context, TNL18 was required to provide the soil conditioning services, supplying the foaming agents ACTISOYL 100, ACTISOYL 20W The polymer ACTI+ WW was essential to advance properly through the rocks.

 

Regarding sealing, ACTISEAL PS1 tail seal grease was used.

During the execution of the Project, the permanent technical service offered by TNL18, as well as the hyperbaric solutions, were essential.

Product used
Soil conditionning
ACTISOYL 100 ACTISOYL 20W ACTI+ WW
Tail Seal Grease
ACTISEAL PS1
Services
Technical service Hyperbaric solutions
Project’ pictures

Photo & vidéos reports

other projects

Your may also be interested in

Here you can check another important Projects
Mexico
Train Interurbano Toluca

Train Interurbano Toluca

UK
High Speed 2

Skanska Costain Strabag joint venture, is delivering full detailed design and construction of Phase One of the UK’s new high-speed railway in the southern section of the overall High Speed Two (HS2) project.

UK
Thames Tideway Central

The Thames Tideway Central Tunnel is the longer part of the Thames Tideway Tunnel Project that consist of the sewage water collection of London from Acton to Abbey Mills pumping Station.